• 0

Project Consultancy, Reports & Profiles

·         Reasons for Starting a Business in Angola

While Angola may not be the first African country to consider when you're looking for investment opportunities. There are plenty of reasons why you should give it serious consideration. It's one of the fastest-growing economies globally, and that has attracted investors from around the globe who want to get in on the action while they can still get in under the radar. If you're looking to start a business in Africa, consider Angola as your next best option!

 

·         Opportunities across Industries

With an economy projected to grow by over 10% annually, plenty of opportunities exists across many industries. Some of these include construction, mining, and agriculture. The country is also rich with natural resources such as diamonds and oil reserves. This has attracted foreign investors who have helped boost growth in these sectors. As well as attracting investment, Market Opportunities. Oil and Gas. Energy. Agricultural Products. Angola- Agricultural Equipment. Transportation Aviation and Rail Import Requirements and Documentation. Political & Economic Environment. Political Environment.

 

·         Large Market Potential

The Angolan economy has been growing quickly, and its large market potential makes it an attractive location to set up shop. It's projected to be one of Africa's biggest economies by 2017, and you can get in on that success now with a stake in Angola's booming diamond industry. With diamonds already making up a significant part of Angola's GDP, there are many opportunities for growth in other sectors. As more people have money to spend, they will need goods and services—and your company is poised to provide them.

 

·         Increasing Foreign Investment

Foreign investment is crucial to Angola's growth, so it's good news that public-private partnerships are now being offered. Find out more about what it means and how you can take advantage of these opportunities. In addition, foreign investors may be eligible for exemptions from corporate income tax on their first three years of operation if they set up shop in designated industrial parks or areas with significant infrastructure deficits. In other words, there are several incentives to start your own business in Angola. If you're looking to expand internationally, we encourage you to learn more about Angola's offers.

 

·         There is a lot of Business Opportunity

The Angolan economy grows at 10 percent per year, with strong and stable macroeconomic growth. This is driven by abundant natural resources and untapped petroleum potential, and growing public spending. Also relevant are Angola's location, workforce, market size, and proximity to established markets in Southern Africa and Brazil are also relevant. The country has one of sub-Saharan Africa's largest and most rapidly expanding middle classes. The number of households with discretionary income will increase from 4 million today to 8 million in 2020, representing more than 30% of total households and 50% of urban households. In addition, Angola's population is young and fast-growing (with an average age of 17, which means that consumer demand will remain high for years to come.

 

·         What are the Natural Resources in Angola?

Angola has rich reserves of oil, diamonds, and uranium. They are also known to have abundant deposits of gas, bauxite, iron ore, tin, and other minerals. Some analysts also say that oil is another top natural resource as well. As you can see from all these resources, they have great potential in becoming one of Africa's most powerful countries over time, with great expectations being projected on them. These top ten reasons should give you a good insight into why so many people want to start a business here. There are more than enough opportunities to go around for everyone. The country has just started on its path toward development, and you can be part of it by starting your own business here.

 

·         Business-Friendly Policies and Government Initiatives;

The government's effort to develop and implement policies and programs that support small businesses is evident, particularly in some cities where prime areas have been reserved for micro, small and medium enterprises (MSMEs). Besides creating programs to support MSMEs, local governments put efforts into infrastructure development. They have also set aside land banks for residential subdivisions where qualified businesses can buy or lease lots. In addition, they are crafting initiatives that will help entrepreneurs save time when dealing with regulations and permits. These are just some of many reasons why it is easier to start a business in Davao City than anywhere else in Mind.

 

·         Market Size Angola

Angola has an estimated population of 24.2 million and is projected to grow at an annual rate of 2.1 percent over 2015-2030, reaching 28.5 million by 2030. (21 births per 1,000 people) and life expectancy (60 years) are two indicators that Angola will experience slower population growth than many other sub-Saharan African countries. This can be attributed to limited access to health care services and an increase from 4 million today to 8 million in 2020, representing more than 30% of total households and 50% of urban households. In addition, Angola's population is young and fast-growing, with high poverty levels. In addition, Angola's fertility rate declined from 5.6 children per woman in 1960 to 3.0 children per woman in 2010 as family planning programs have become more widely available.

 

·         Industrial growth in Angola

The country's economy continues to grow steadily, with Gross Domestic Product (GDP) expected to rise by about 4.5% in 2018 and 3.7% in 2019, following growth of 4.6% in 2017, driven by mining activities, especially diamonds and oil production. The level of activity remains quite elevated, particularly compared with other countries on Africa's west coast: industrial output and fixed investment continue growing steadily, and employment rates remain high.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Manufacturing Business of Disposable Plate and Cups from Waste Rice Husk Powder
Manufacturing Business of Disposable Plate and Cups from Waste Rice Husk Powder

 

Disposable plate ... Read More

Capacity :
Disposable Plates from Waste Rice Husk Powder: 10,000 Pcs per Day Disposable Cups from Waste Rice Hu
Plant and Machinery cost:
38.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.44%
Break Even Point (BEP):
59.78 %
TCI :
0.00 Lakhs
Cost of Project :
166.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags from Corn & Cassava Starch
Biodegradable Plastic Bags from Corn & Cassava Starch

Cassava starch or tapioca starch, a product extracted from fresh roots is one of the major commercial starches i... Read More

Capacity :
Biodegradable Plastic Bags from Corn Starch (Per Bag 25 gms Size):1,800 MT per annum Biodegradable P
Plant and Machinery cost:
1053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1523.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags- Biodegradable Compostable Carry Bag, Eco friendly Bag Production from Corn & Cassava Starch
Biodegradable Plastic Bags- Biodegradable Compostable Carry Bag, Eco friendly Bag Production from Corn & Cassava Starch

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation ... Read More

Capacity :
Biodegradable Plastic Bags from Corn Starch (Per Bag 25 gms Size): 6 MT / Day Biodegradable Plastic
Plant and Machinery cost:
1053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1768.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack: 16,800 Nos per Annum
Plant and Machinery cost:
504.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1381.00Lakhs
Add To Inquiry Basket
Lead Acid Battery Manufacturing Industry
Lead Acid Battery Manufacturing Industry

Lead Acid Battery Manufacturing Industry. Production of Lead Acid Storage Battery Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Glycerin Bath Soap (Pears Type)
Glycerin Bath Soap (Pears Type)

Soaps vary a great deal in terms of their ingredients. For example, while some soaps make your skin dry, other soaps a... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack : 56 Nos/day
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1076.00Lakhs
Add To Inquiry Basket
Battery for Auto Vehicles
Battery for Auto Vehicles

An automotive... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Plastic Battery Containers
Plastic Battery Containers

Battery containers made of molded plastic generally have internal partitions formed as integral parts of the bottom and side walls of the container... Read More

Capacity :
3500 Sets/Day
Plant and Machinery cost:
84.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
119.00Lakhs
Add To Inquiry Basket
Blue Detergent Powder
Blue Detergent Powder

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Plastic Battery Containers Manufacturing Business
Plastic Battery Containers Manufacturing Business

Plastic Battery Containers Manufacturing Business. Battery Storage Containers Product... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lead Battery Recycling
Lead Battery Recycling

Lead Battery Recycling

Manufacturing Plant, Detailed Project Report... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice stra... Read More

Capacity :
Disposable Paper Cups :7.5 MT/Day Disposable Paper Plates:7.5 MT/Day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.18%
Break Even Point (BEP):
56.37 %
TCI :
314.00 Lakhs
Cost of Project :
314.00Lakhs
Add To Inquiry Basket
Production Unit of Liquid Washing Soap, Perfumed Bleach for the Wash of White Cloths, Toilet Tills Hard Stains Remover Liquid , Detergent Powder
Production Unit of Liquid Washing Soap, Perfumed Bleach for the Wash of White Cloths, Toilet Tills Hard Stains Remover Liquid , Detergent Powder

Production Unit of Liquid Washing Soap, Perfumed Bleach for the Wash of White Cloths, Toi... Read More

Capacity :
Detergent Powder:3.2 MT/day•Liquid Washing Soap:3.2 MT/day •Toilet Cleaner:3.2 MT/day •Perfumed Blea
Plant and Machinery cost:
72.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
74.00 %
TCI :
210.00 Lakhs
Cost of Project :
210.00Lakhs
Add To Inquiry Basket
SOLAR PANEL
SOLAR PANEL

Solar Panels are in general Silicon ... Read More

Capacity :
Solar PV Module (240 watt) : 350 Nos/day (25 MW)
Plant and Machinery cost:
278.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
852.00 Lakhs
Cost of Project :
852.00Lakhs
Add To Inquiry Basket
TOILET SOAP
TOILET SOAP

Toilet soaps account for the largest single share of about 13% in the estimated Rs 530 bn FMCG market. The toilet soaps market is estimated at over... Read More

Capacity :
14400 MT/Annum
Plant and Machinery cost:
399.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
28.00 %
TCI :
3000.00 Lakhs
Cost of Project :
3000.00Lakhs
Add To Inquiry Basket
SOAP NOODLES
SOAP NOODLES

Soap Noodles are made from vegetable oils, such as palm oil, coconut oil or olive oil and animal fats. These are saponified usually using sodium hy... Read More

Capacity :
3600 MT/Annum Soap Noodles
Plant and Machinery cost:
156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
41.00 %
TCI :
665.00 Lakhs
Cost of Project :
665.00Lakhs
Add To Inquiry Basket
DETERGENT POWDER
DETERGENT POWDER

Detergent is used for synthetic detergents derived from petroleum products. Soaps are the earliest form of detergents. The function of soap is to r... Read More

Capacity :
6000.00 MT/Annum
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
37.00 %
TCI :
599.00 Lakhs
Cost of Project :
599.00Lakhs
Add To Inquiry Basket
SOLAR PHOTOVOLTAICS-A VIABLE FUTURE ALTERNATIVE OF RENEWABLE ENERGY
SOLAR PHOTOVOLTAICS-A VIABLE FUTURE ALTERNATIVE OF RENEWABLE ENERGY

Solar energy is an enormous resource... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
GOOD OPPORTUNITY IN SOLAR POWER PLANT
GOOD OPPORTUNITY IN SOLAR POWER PLANT

In case of Photovoltaic or direct conversion of sunlight to electricity via solar cell, the efficiencies limited to about 20 percent of the absorbe... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Solar Cell
Solar Cell

Solar cell comprises by two words. Solar means sunlight & cell is the device to provide the current supply and as the whole solar cell is devic... Read More

Capacity :
10000 Nos. / Day
Plant and Machinery cost:
49.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
39.00 %
TCI :
358.00 Lakhs
Cost of Project :
358.00Lakhs
Add To Inquiry Basket
Washing Soap and Washing Powder (Nirma Type)
Washing Soap and Washing Powder (Nirma Type)

Soaps are the earliest form of detergents. Detergents are defined as complete washing or cleaning products, which contain among their ingredients a... Read More

Capacity :
1 MT / Day
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
45.00 %
TCI :
38.00 Lakhs
Cost of Project :
38.00Lakhs
Add To Inquiry Basket
Nerol Soap and Detergent
Nerol Soap and Detergent

Chemically speaking soaps are salt of fatty acid, generally mixture of various such salts. Based upon their properties, soaps are broadly classifie... Read More

Capacity :
1200.00 MT/Year
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
66.00 %
TCI :
131.00 Lakhs
Cost of Project :
131.00Lakhs
Add To Inquiry Basket
Toilet Soap
Toilet Soap

In the modern society due to awareness towards the hygiene, Toilet soap has how become the necessity of life. Urbanization and development to touri... Read More

Capacity :
1000 Kgs/Day
Plant and Machinery cost:
8.00 Lakhs
Working Capital :
38.00
Rate of Return (ROR):
49.41%
Break Even Point (BEP):
40.34 %
TCI :
76.00 Lakhs
Cost of Project :
76.00Lakhs
Add To Inquiry Basket
Soap Coated Paper
Soap Coated Paper

This product is handy and cheap and has versatile application. It is useful during travelling as one can carry in his pocket and after use it can b... Read More

Capacity :
90 Kgs /Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
7.00
Rate of Return (ROR):
40.83%
Break Even Point (BEP):
53.47 %
TCI :
19.00 Lakhs
Cost of Project :
19.00Lakhs
Add To Inquiry Basket
Business Plan for Glass Sheet & Float Glass
Business Plan for Glass Sheet & Float Glass

Glass Sheet &a... Read More

Capacity :
Float Glass 8mm: 1,500,000 Sq.mt. Per Annum Sheet Glass 4mm: 3,000,000 Sq.mt. Per Annum
Plant and Machinery cost:
26100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
14.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
34600.00Lakhs
Add To Inquiry Basket
How to Start Manufacturing Business of Seaworthy Containers
How to Start Manufacturing Business of Seaworthy Containers

 

What Are Seaworthy Containers?<... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Starting a Business? Here's the Best Plans for You!
Starting a Business? Here's the Best Plans for You!

Introduction:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Latex Mattress (Talalay Process)
A Business Plan for Latex Mattress (Talalay Process)

Latex mattress... Read More

Capacity :
Latex Mattress Size 75 x 70 x 5 inch (33Kg) 30 Nos. Per Day
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
208.00Lakhs
Add To Inquiry Basket
Setup plant  Of WIRE NAILS
Setup plant Of WIRE NAILS

Wire nails are a type of fastener, often used in construction and building projects. ... Read More

Capacity :
Wire Nails 160 MT Per Day
Plant and Machinery cost:
2635.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
3550.00Lakhs
Add To Inquiry Basket
Setup Plant Of Sodium Bicarbonate  from Soda Ash
Setup Plant Of Sodium Bicarbonate from Soda Ash

 

Sodi... Read More

Capacity :
Sodium Bicarbonate (Powder) 100 MT Per Day
Plant and Machinery cost:
1765.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
3248.00Lakhs
Add To Inquiry Basket
A Business Plan For Wall Putty
A Business Plan For Wall Putty

 

Wall... Read More

Capacity :
Wall Putty 1,850 Bag Per Day
Plant and Machinery cost:
56.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
412.00Lakhs
Add To Inquiry Basket
Get Started Today and Explore Your Business of Carbon Black N990 Now!
Get Started Today and Explore Your Business of Carbon Black N990 Now!

What is Carbon Blac... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Producing Your Own Cold Pressed Rice Bran Oil (Edible Oil) Business Today!
Start Producing Your Own Cold Pressed Rice Bran Oil (Edible Oil) Business Today!

What is Rice Bran Oil (Edible Oil)? Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of TRANSFORMER OIL
Start Production Of TRANSFORMER OIL

Transformer oil is a type of specialized oil that is used as an insulation and cooling medium in electric... Read More

Capacity :
Transformer Oil 100 KLS Per Day
Plant and Machinery cost:
1900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
9300.00Lakhs
Add To Inquiry Basket
A Business Plan for Silica Gel Crystal & Beads    from Sodium Silicate and Sulphuric Acid
A Business Plan for Silica Gel Crystal & Beads from Sodium Silicate and Sulphuric Acid

Silica Gel crystals & beads from sodium silicate and sulphuric acid are small porous granules made of silica. The process of manufacturing thes... Read More

Capacity :
Silica Gel Crystals & Beads 1000 MT Per Annum
Plant and Machinery cost:
504.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
912.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags  From Corn Starch Plant
Biodegradable Plastic Bags From Corn Starch Plant

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation characteris... Read More

Capacity :
45 kg/hr
Plant and Machinery cost:
14.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Industry of Geogrid
Start Industry of Geogrid

Geogrid is a polymeric or steel-reinforced plastic grid material used to reinforce soils and create a stronger, more durabl... Read More

Capacity :
Geogrid 30,000 Sq.Mtrs Per Day
Plant and Machinery cost:
879.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
1766.00Lakhs
Add To Inquiry Basket
Start Herbicides Production From Artemisia Annua
Start Herbicides Production From Artemisia Annua

 

Artemisia annua, ... Read More

Capacity :
-
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
370.00Lakhs
Add To Inquiry Basket
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)


Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging

Four businesses that are now seeing great success in the market are soy nuggets, tea ... Read More

Capacity :
-
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
380.00Lakhs
Add To Inquiry Basket
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business

The active ingredients in pharmaceutical medications that have a therapeutic effect o... Read More

Capacity :
-
Plant and Machinery cost:
275.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
963.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Polyacrylamide
Manufacturing Business Of Polyacrylamide

In many industrial and envi... Read More

Capacity :
Polyacrylamide Liquid 50% Solution 200 MT Per Day
Plant and Machinery cost:
2247.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4304.00Lakhs
Add To Inquiry Basket
Start Production of Zinc Chloride
Start Production of Zinc Chloride

 

An inorganic subs... Read More

Capacity :
Zinc Chloride from Zinc Ash 2,700 MT Per Annum Zinc Chloride from Zinc Oxide 300 MT Per Annum
Plant and Machinery cost:
229.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
751.00Lakhs
Add To Inquiry Basket
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam

A wide range of food processing operations are consolidated under o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant Of Aluminium from Bauxite
Setup Plant Of Aluminium from Bauxite

Aluminium is a lightweight ... Read More

Capacity :
Aluminium Ingot 10 MT Per Day
Plant and Machinery cost:
818.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2280.00Lakhs
Add To Inquiry Basket
Setup Unit Of Menthol Crystals From Mint Oil
Setup Unit Of Menthol Crystals From Mint Oil

Menthol crystals are a type of organic compound that have a cooling, minty aroma. The... Read More

Capacity :
Menthol Crystals 300,000 Kg. Per Annum Dementholised Oil (DMO) 100,000 Kg. Per Annum
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
701.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Sulphate (Anhydrous)
A Business Plan For Sodium Sulphate (Anhydrous)

Sodium sulfate, also known as sodium sulphate, is a white crystalline compound with t... Read More

Capacity :
Sodium Sulphate (Anhydrous) 10 MT Per Day HCl 32% 15 MT Per Day
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Copper Flats & Copper Tubes
Start Manufacturing Business Copper Flats & Copper Tubes

Copper flats and copper tub... Read More

Capacity :
Copper Flats or Sections 2,000 MT Per Annum Copper Tubes 1,600 MT Per Annum Copper Scraps 55 MT P
Plant and Machinery cost:
353.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1333.00Lakhs
Add To Inquiry Basket
Set up Dry Yeast For Bakery and Alcohol Industry
Set up Dry Yeast For Bakery and Alcohol Industry

 

Dry yeast is a ty... Read More

Capacity :
Dry Yeast 5,000 Kgs per day
Plant and Machinery cost:
1080.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1703.00Lakhs
Add To Inquiry Basket
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)

Fishing Net to Pellet refers to the innovative process of rec... Read More

Capacity :
Hdpe/Pvc/Nylon/Hdpe Pellet 2,000 MT Per Annum
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Setup Unit Of Animal Feed From Bagasse
Setup Unit Of Animal Feed From Bagasse

Animal feed from bagasse re... Read More

Capacity :
Animal Feed 100 MT Per Day
Plant and Machinery cost:
125.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1320.00Lakhs
Add To Inquiry Basket
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil

Bottling of refined oil refers to the process of packaging hi... Read More

Capacity :
-
Plant and Machinery cost:
402.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1975.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Manganese From Manganese Ore
Start Manufacturing Business Manganese From Manganese Ore

Manganese is a chemical ele... Read More

Capacity :
Manganese Ingot 10 MT Per Day
Plant and Machinery cost:
666.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
2192.00Lakhs
Add To Inquiry Basket
Soda Ash Market of Middle East and North Africa (MENA)
Soda Ash Market of Middle East and North Africa (MENA)

Sodium carbonate, often known as soda ash, is a whit... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of Calcium Silicate Blocks
Start Production Of Calcium Silicate Blocks

 

Calcium silicate ... Read More

Capacity :
Calcium Silicate Blocks 100 Sq.Mt. Per Day
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
408.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate

 

L-Glutamic acid a... Read More

Capacity :
L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day
Plant and Machinery cost:
867.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2590.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity :
Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
84.00Lakhs
Add To Inquiry Basket
Start Production of Expandable & High Purity Graphite
Start Production of Expandable & High Purity Graphite

Expandable Graphite refers to a form of graphite that has bee... Read More

Capacity :
Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day
Plant and Machinery cost:
206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1598.00Lakhs
Add To Inquiry Basket
Start  Waste Lubricating Oil Recycling Plant
Start Waste Lubricating Oil Recycling Plant

Waste Lubricating Oil Recyc... Read More

Capacity :
Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum
Plant and Machinery cost:
355.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
3101.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...

Showing 361 - 420 of 529 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR